Scope

Condenser pad replacement

Documented

September 2026

Support

Tamped stone, cement slabs, pinned 6×6 beams

Project story

The documented scope.

Replacement of an old, unstable and unlevel condenser pad: the area was cleared, trenched and leveled, then tamped stone and cement slabs with pinned 6×6 beams were set to support the condenser.

01

Challenge

The existing pad under the condenser was old, unstable and unlevel.

02

Execution

The area was cleared, trenched and leveled. Tamped stone and cement slabs were set beneath the condenser, and 6×6 beams were pinned in place around the base. The photographs show the unit on its original pad, work in progress with levels and pins, and the finished base. The record does not identify who performed the pictured trade work.

03

Capabilities Demonstrated

Site preparation · Trenching and leveling · Stone base · Timber edging

Selected views

Condenser on a gray pad over cement slabs and crushed stone within pinned wood beam edging.
Finished condenser base with stone, cement slabs and 6×6 beam edging.
Side view of condenser resting level on a gray pad amid river stone beside a stucco wall.
Finished view of the condenser on its leveled base.
Condenser on its existing gray pad in a river-stone bed beside a stucco wall and shrub.
Initial view of the condenser and existing pad.

Complete project record

Every available original is included below in documented order.

All photos

17 photos
Finished condenser base with stone, cement slabs and 6×6 beam edging.
Finished view of the condenser on its leveled base.
Initial view of the condenser and existing pad.
Work in progress — condenser and pad checked with levels.
Work in progress — pad supported while the base is prepared.
Work in progress — stone base and beam with pins.
Initial close view of the condenser on the existing pad.
Initial overhead view of the condenser and surrounding stone.
Initial side view of the condenser, pad and service lines.
Work in progress — stone cleared beside the condenser.
Work in progress — leveling tools and loose beams around the pad.
Work in progress — front beam checked with a level.
Close view of a wood beam, steel pin and pad edge.
Work in progress — pinned beam corner around the base.
Work in progress — side beam checked with a level.
Work in progress — stone base contained by pinned beams.
Completed wood beam frame around the condenser base.

Your project

Have a project in mind?

Discuss your project

Show us the challenge. 
We’ll help shape the solution.

Every project starts with existing conditions, project constraints, and the end goal. Give us the context, and we’ll help determine the right path forward.

Your inquiry goes directly to Michael at Prime Source Development. Your details are used only to respond to this project.