Challenge
The existing pad under the condenser was old, unstable and unlevel.
Site and equipment support
Condenser pad replacement and leveling

Condenser pad replacement
September 2026
Tamped stone, cement slabs, pinned 6×6 beams
Project story
Replacement of an old, unstable and unlevel condenser pad: the area was cleared, trenched and leveled, then tamped stone and cement slabs with pinned 6×6 beams were set to support the condenser.
The existing pad under the condenser was old, unstable and unlevel.
The area was cleared, trenched and leveled. Tamped stone and cement slabs were set beneath the condenser, and 6×6 beams were pinned in place around the base. The photographs show the unit on its original pad, work in progress with levels and pins, and the finished base. The record does not identify who performed the pictured trade work.
Site preparation · Trenching and leveling · Stone base · Timber edging
Selected views



Complete project record
Every available original is included below in documented order.
Your project
Discuss your project
Every project starts with existing conditions, project constraints, and the end goal. Give us the context, and we’ll help determine the right path forward.
Keep exploring

$4.2M · 12-unit condominium development
A 12-unit condominium development with demolition and modular assembly documented as part of the project.
View Project
Loading dock and footing repair after tractor-trailer impact
A collision-damaged dock and footing required temporary stabilization and coordinated structural repair.
View Project