Challenge
A tractor-trailer collision damaged the loading dock and footing.
Structural recovery
Loading dock and footing repair after tractor-trailer impact

Carlstadt, NJ
Collision damage
Dock + footing repair
Project story
A collision-damaged dock and footing required temporary stabilization and coordinated structural repair.
A tractor-trailer collision damaged the loading dock and footing.
Granite beneath the footing and constrained access complicated the repair.
The work involved temporary stabilization and coordination with engineering and inspection.
Michael performed framing, plywood, and concrete wall repair. Welding was performed by another person.
Structural recovery · Concrete repair · Field coordination
Selected views



Complete project record
Every available original is included below in documented order.
Your project
Discuss your project
Every project starts with existing conditions, project constraints, and the end goal. Give us the context, and we’ll help determine the right path forward.
Keep exploring

$4.2M · 12-unit condominium development
A 12-unit condominium development with demolition and modular assembly documented as part of the project.
View Project
Residential construction with modular assembly and site work
Documented stages include garage footings, a basement slab, modular work, a composite porch and rear deck, and finished interiors.
View Project