Interior repair

West Orange bathroom wall repair

Sixth-floor bathroom wall repair after water damage

Bathroom wall opened floor to ceiling, showing metal studs, drain stack and piping.
Work in progress — opened wall with metal studs and plumbing exposed.
Scope

Bathroom wall repair

Documented

October 2024

Location

Sixth floor

Project story

The documented scope.

Repair of a sixth-floor bathroom wall damaged by water from above. Materials moved along a long elevator route; the existing framing was poor, the medicine cabinet opening was reframed, and wood blocking was added. No finished bathroom photograph has been verified.

01

Challenge

Water from above had damaged the sixth-floor bathroom wall, materials had to travel a long elevator route, and the existing framing was poor.

02

Execution

The medicine cabinet opening was reframed and wood blocking was added. The photographs show the opened wall with metal studs and plumbing exposed, and new board hung on the lower wall. The record does not identify who performed the pictured trade work, and no finished bathroom image has been verified.

03

Capabilities Demonstrated

Water-damage repair · Reframing · Blocking · Access logistics

Selected views

Bathroom wall opened floor to ceiling, showing metal studs, drain stack and piping.
Work in progress — opened wall with metal studs and plumbing exposed.
Opened upper wall showing metal framing, black drain stack, copper pipes and wiring.
Work in progress — upper framing around the drain stack.
White toilet and grab bar beside an opened metal-stud wall.
Work in progress — toilet and grab bar beside the opened wall.

Complete project record

Every available original is included below in documented order.

All photos

17 photos
Work in progress — opened wall with metal studs and plumbing exposed.
Work in progress — upper framing around the drain stack.
Work in progress — toilet and grab bar beside the opened wall.
Work in progress — board installed on the lower wall.
Work in progress — wall and ceiling opened around plumbing.
Work in progress — drain piping exposed above the tiled wall.
Work in progress — metal framing and plumbing exposed.
Work in progress — framed wall opening around the plumbing.
Work in progress — close view of studs, tracks and pipes.
Work in progress — upper framing and wall cavity detail.
Work in progress — metal framing around the wall opening.
Work in progress — plumbing connections within the open wall.
Work in progress — lower wall partially closed with board.
Work in progress — board installed across the lower wall.
Work in progress — board fitted around the wall opening.
Work in progress — open framed section retained within new board.
Work in progress — boarded wall with framed opening still exposed.

Your project

Have a project in mind?

Discuss your project

Show us the challenge. 
We’ll help shape the solution.

Every project starts with existing conditions, project constraints, and the end goal. Give us the context, and we’ll help determine the right path forward.

Your inquiry goes directly to Michael at Prime Source Development. Your details are used only to respond to this project.