Execution
The documented sequence spans May and June 2025. On May 5, the existing finished basement appears with carpet flooring removed and a section of ceiling opened. On May 12, photographs show wall framing alongside the stone foundation wall, a framed ceiling opening around the electrical panel, and drywall hung over the framing. On May 23, drywall covers the lower wall sections. By June 17, the room is finished with carpet, painted walls, a drop ceiling with recessed lighting, and trim. The record does not identify who performed the pictured trade work, and further scope details are pending review.